Project of the Month
„Optimization of material supply through the use of AGVs"
CUSTOMER NEEDS
· Clear separation between value-adding and
logistical processes
· Reduction of buffer and storage areas
· Minimizing production stoppages due to
missing or incorrect material
· Reduction in personnel costs
RESULTS
· Clear material flows were implemented
· Continuously synchronized material flow established
· Reduction of personnel costs
· Existing material carriers were integrated into the new concept
· Space requirements have been reduced
· Wrong deliveries and search times could be drastically reduced