Project of the Month


„Optimization of material supply through the use of AGVs"


Productivity increase

approx. 15 %


Reduction of storage space

approx. 12 %

CUSTOMER NEEDS


· Clear separation between value-adding and

  logistical processes

· Reduction of buffer and storage areas

· Minimizing production stoppages due to

  missing or incorrect material

· Reduction in personnel costs




RESULTS


· Clear material flows were implemented

· Continuously synchronized material flow established

· Reduction of personnel costs

· Existing material carriers were integrated into the new concept

· Space requirements have been reduced

· Wrong deliveries and search times could be drastically reduced