Project of the month
"Make 2 into 1"
Increasing capacity by producing components in double widths
RESULTS
· 55% fewer passes in drilling
· 40% fewer total passes in edge banding
· 80% reduction in one-sided
edge banding passes
· 40% reduction in cutting quantities
· up to 70% less staff required in
component production (depending on the
final degree of automation)
In addition, material transport between the machines can be significantly reduced.
EXISTING SITUATION
· Serial furniture production needs to be modernized and capacity increased.
· Machinery is outdated and less automated.
· Labor intensive processes are being used.
· Only a few machines are equipped with feeding systems.
· Production of all parts are in single width.
APPROACH
· Completion of a current state analysis and documentation
· Analyzation of the range of parts according to quantities and required processing
· Identification of components that can be manufactured in double widths
· Determination of the impact on the overall process
· Conceptualization of possible manufacturing technologies
· Presentation of potential capacity increase