Project of the Month


"Organized and Structured? Yes we can!”"


efficient in two days

KEY NUMBERS


  • Training of employees and implementation on-site in 2 days
  • Detect and eliminate waste factors
  • Increase value-adding activities


INITIAL SITUATION


  • Unnecessary transport effort
  • Long search times
  • Inaccurate labeling
  • No standards at workplaces (labeling of material containers, garbage systems, cleaning boards)
  • Fast implementation measures are needed

APPROACH


  • Conduct a waste analysis on-site
  • Conceptual design of a pilot workplace
  • Develop and record workplace standards
  • Assist with implementation measures
  • Prepare auditing plans
  • Establish and designate a CIP coordinator
  • Train employees on future proceedings

Share by: