Project of the Month
"Balancing an assembly line"
Increasing output by accurately balancing workloads on the assembly line
KEY NUMBER OF THE PROJECT
Optimized cycle and throughput time by
12%
Clearly defined tasks and work content for each assembly station
APPROACH
- Determination of the total work content of the future assembly line.
- Dividing the content into meaningful assembly cycles.
- Determination of missing assembly times.
- Capacity calculation for each cycle and assembly station
- Balancing the individual stations and their work content in relation to each other.
- Determination of personnel requirement
- Development of a material supply concept for the assembly line
RESULTS
- Definition of the individual assembly cycles and their contents (workloads, required material, fittings, etc.)
- Assembly cycles are coordinated with each other in terms of content and timing.
- Personnel requirements for the entire assembly line is defined.