THE INITIAL SITUATION
OUR SERVICES
· Analyzed material flows
· Identified sources for losses within process
engineering, design or the organization
· Evaluated the monetary loss
· Established measures to reduce those
losses
EDGES (RUNNING METRES)
-73 000 LFM
OVERSPRAYED AREA
-10,5 %
THE RESULT
· Trimmed timber excess lengths and edge
widths 73,000 running meters
(approximately € 11,000 per year)
· Saved edge material
· Optimized line design at the top
· Reduced unnecessary space by 10,5% (approximately € 11,000 per year or 1,150 l varnish)
· Further savings of approximately € 75,000
per year
THE INITIAL SITUATION
OUR SERVICES
· Analyzed and optimized cutting
and nesting processes
· Analyzed system-specific
(technical and human factors
and gradually stopped errors
· Tested and selected nesting
alternatives and equipment
technologies
· Analyzed stored quantities
YEARLY SAVINGS
65.000 €
by thinning the sample collection
MATERIAL USAGE
-240.000 €